In recent news, we have received a permit for a new tax office build-out in Palos Hills and construction has begun.
The new 970 sf build-out will occupy a space previously occupied by a nail salon. The space has remained unoccupied for approximately 20 years. The strip mall has recently had some major renovations performed with a new roof and roof top mechanical units.
All interior elements of the existing space are being demolished and new full walls will be provided throughout. The ceiling will be open with exposed spiral duct and suspended linear LED light fixtures serving the main open areas. Offices, conference room and toilet room will have a standard drop ceiling with 2×2 LED fixtures.
The user desired to maximize the number of offices and provide a lunch room for staff. Space limitations prevented the incorporation of a lunch room so an alternative open lounge was planned within the main open space. The walls wrapping the galley snack counter are partial height in order to maintain the open feel of this tight space. The existing toilet room was expanded to meet current accessibility requirements.
0 Comments